Procedure

AIR-C1 monthly preventive maintenance

PM-UTIL-014 · Rev B

Craft

Multi-craft

Source

Plant SOP · offline cache

Progress

0/3 · 0%

Reported symptom

Scheduled PM due. Last service notes mild belt dust.

Step 1 of 3

Safety gate required

Depressurize and isolate

Unload compressor. Close receiver isolation valve. Bleed residual pressure at the local drain until gauge reads 0 psi. Lock out electrical disconnect C1-DISC.

Safety gate · Energy isolation

Zero pressure + LOTO

Confirm receiver/local gauge at 0 psi and electrical lock applied before opening guards.