Plant floor · Shift board
Guided repair with safety gates first
Open a work order, clear mandatory isolation and PPE checks, then run the procedure step by step. Core playbooks stay on the local cache when the plant network drops.
Assists technicians — does not replace LOTO authority, code compliance, or your judgment on live equipment.
- Open jobs
- 4
- Critical
- 1
- Cached offline
- 3
- Mode
- Hybrid local
Job queue
Sorted by priority. Select a row to open the guided procedure.
- WO-10482Open
Replace failed drive-end bearing
CONV-A12 · Packaging line conveyor
Loud growling at drive end; line tripping on over-temp after 12 minutes of run.
Packaging · Bay 3
Plant SOP · cached
CriticalMechanical · 45mMechanical
45m
- WO-10491Open
Troubleshoot panel fan and thermal trip
PNL-E07 · Line 2 control panel
Panel thermal alarm; cabinet warm to touch; intermittent VFD fault F0004.
Assembly · Electrical closet
OEM manual · cached
HighElectrical · 30mElectrical
30m
- WO-10511Open
Investigate hydraulic leak at press
PRS-2 · Forming press
Oil mist under platen; level drop ~1 gallon per shift.
Stamping
General library · cloud assist
HighMechanical · 40mMechanical
40m
- WO-10502Open
Monthly PM — air compressor skid
AIR-C1 · Plant air compressor
Scheduled PM due. Last service notes mild belt dust.
Utilities
Plant SOP · cached
NormalMulti-craft · 60mMulti-craft
60m